Facebook pixel

Lower Campbell Repair

Home > Erfolgreiche projekte > Lower Campbell Repair

Channelling Works

2012

FLAGSTAFF - ARIZONA - U.S.A.

COCONINO COUNTY

TIFFANY CONSTRUCTION COMPANY

KIMLEY HORN & ASSOCIATES

Lower Campbell Repair

Problem

In 2001, the Schultz fire left the eastern slopes of the San Francisco Peaks barren and prone to flash flooding.

The Campbell Avenue ditch needed to withstand the larger water flows caused by the lack of vegetation during the monsoon season. Maccaferri’s gabions were chosen to provide erosion control protection on the channel’s banks.

The rock-filled gabion baskets could guarantee the protection needed for the hydraulic forces while providing a pleasing aesthetic.

Solution

The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base.

MaxTex® H 60.1 is a non-woven geotextile that was used in conjunction with the gabions to filter the fine soils from the backfill and prevent them from migrating to the gabions. 

Strict adherence to the installation guide was required to achieve the performance and aesthetics required of the project. Maccaferri provided installation training and job site visits. Technical assistance was also given during the design phase.

Used Products

Gabionen
Gabionen
A Wide Portfolio of Solutions Maccaferri offers an extensive range of tailored solutions to meet every specific need. From Übersicht
star

Nehmen Sie noch heute Kontakt mit unseren Experten auf

Unser Expertenteam ist bereit und freut sich darauf, Ihnen zu helfen: Egal, ob Sie Fragen zu unseren neuesten Produkten haben oder maßgeschneiderte Lösungen für Ihre spezifischen Herausforderungen suchen, wir sind nur einen Klick oder einen Anruf entfernt.

Image
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.