44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massVoirstar
50 YEAR OLD GABION STRUCTURE, RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Voirstar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecVoirstar
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Voirstar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MVoirstar
AMASYA HIGHWAY SLOPE PROTECTION PROJECT
In accordance with the site visit of our technical team and the request made by the authorities the installation of Macmat R1 in combination with surfVoirstar
Aménagement d’un talus viticole – Jaulgonne, 02
Pour réaliser ce projet, la société France Maccaferri a fourni et mis en œuvre un ouvrage de soutènement en remblai renforcé de type Terramesh VVoirstar
AMENAGEMENT D’UNE BUTTE ANTIBRUIT
L’ouvrage est un remblai renforcé à parement minéral vertical ayant une hauteur variable entre 2 et 6m suivant les profils. Maccaferri a proposéVoirstar
AMÉNAGEMENT DE LA 2X2 VOIES DE LA RN 57
France MACCAFERRI a été choisi par VCT pour réaliser une étude proposant deux ouvrages de soutènement en remblai renforcé à parement vertical bVoirstar
AMENAGEMENT DE L’ILE SEGUIN
Lors de ce projet, la société France MACCAFERRI a réalisé une étude proposant la réalisation d’une protection superficielle des berges de la SVoirstar
AMENAGEMENT DES BERGES DU RHIN
Il s’agissait de créer un escalier constitué de 5 marches en gabions de 50cm de hauteur. La protection mesure un linéaire total de 102ml : 100mlVoirstar
AMÉNAGEMENT DU CŒUR DE PARC DES PRÉS DE VAUX
France Maccaferri a été sollicitée pour réaliser l’étude et la mise en œuvre de deux murs en remblai renforcé à parement minéral de type TeVoirstar
AMÉNAGEMENT DU QUARTIER PALIKA
Les murs de soutènement des bassins de compensation ont été réalisés en gabions double torsion posés sur des matelas Reno pour protéger les muVoirstar
AMENAGEMENTS DES BERGES DE LA SEINE
Dans le cadre de ce projet, France Maccaferri a réalisé le dimensionnement des protections de berges en utilisant des Matelas Reno et des gabions enVoirstar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Voirstar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tVoirstar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosVoirstar
AUGMENTATION DE LA CAPACITE FLUVIALE DES APPONTEMENTS POUR BATEAUX
La CNR, maîtrise d’œuvre du projet, a retenu une solution par matelas gabions préremplis de 30cm d’épaisseur, afin de protéger les berges et Voirstar
AUTOROUTE A11-AMENAGEMENT PORTE DE GESVRES
La société Spie Batignolles qui a réalisé le chantier, a sollicité France Maccaferri qui a apporté son support technique en réponse aux exigencVoirstar
AUTOROUTE A52
Dans le cadre de ces aménagements, la société France Maccaferri a proposé sa barrière RB3000WGC. Il s'agit d'une barrière sans ancrages Voirstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErVoirstar
AVALOIR DE PROTECTION CONTRE LES CHUTES DE BLOCS VALLON DU FRACHET
Après analyse du projet, France Maccaferri a réalisé le dimensionnement, les notes de calcul justifiant les composants et les coupes types de détaVoirstar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxVoirstar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsVoirstar
BASE DE LOISIRS SAINT-GERMAIN DES FOSSES ET BILLY
Un mur poids en gabions double torsion a donc été réalisé dans le cadre de ces aménagements. La protection de la berge séparative retenue consisVoirstar
BASES AVANCÉES DE LA MINUSMA
Pour ce faire, les Defencell Mac, (éléments multicellulaires fabriqués à partir de panneaux en treillis soudés et reliés à l’aide de spiralesVoirstar
BASSIN MADAGASCAR, ECOQUARTIER FLAUBERT
Les murs de soutènement en gabions double torsion constituant les flancs du bassin Madagascar ont été dimensionnés, fourni et mise en œuvre par lVoirstar
BATIMENT DE STOCKAGE BIC
La société France Maccaferri a été sollicitée pour fournir des merlons d'une épaisseur de 30 cm en Matelas Reno afin d'éviter les risquVoirstar
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Voirstar
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Voirstar
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tVoirstar
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bVoirstar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trVoirstar
BIFURCATION A10/171 ORLEANS
Les remblais renforcés réalisés par Maccaferri constituaient les murs en retour des culées C1 et C3 de l’ouvrage PSI986. Ce viaduc permet de relVoirstar
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aVoirstar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Voirstar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Voirstar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshVoirstar
BOULEVARD URBAIN OUEST
France Maccaferri a proposé son principe en remblai renforcé parement minéral, le Terramesh Minéral, qui associe esthétisme et technicité. Il eVoirstar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenVoirstar
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteVoirstar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisVoirstar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisVoirstar
CASERNEMENT DE CERCOTTES
Dans le cadre de ces aménagements, la société Maccaferri a proposé la réalisation de murs libres en gabions. Ils présentent une hauteur constantVoirstar
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiVoirstar
CENTRE D’ENFOUISSEMENT TECHNIQUE DU BARRAGE DE NACHTIGAL CAMEROUN
Lors de ces aménagements, un centre d’enfouissement technique a dû être construit. A la demande du groupement ORTEC – EDF et CCN, la société Voirstar
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleVoirstar
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lVoirstar
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6 feet tall. The proposed channel sidewalls will be stabilized with gabiVoirstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Voirstar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Voirstar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightVoirstar
Confortement d’un glissement de terrain à ChâteauChalon
L'entreprise Guinot TP a consulté France Maccaferri pour réaliser le dimensionnement et la fourniture de la solution en remblai renforcé type TVoirstar
Confortement des berges du Maravenne, La Londe Les Maures, 83
L'entreprise Eiffage Forézienne a consulté France Maccaferri pour effectuer le dimensionnement, la fourniture et la pose de l'ouvrage définVoirstar
CONSTRUCTION CENTRE EXPLOITATION DES ROUTES
Maccaferri a réalisé la fourniture et la pose d'un mur de soutènement en remblai renforcé Terramesh minéral d'une hauteur de 3m. Les deuxVoirstar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
Les renforts en géobandes Paraweb® MD45 ont été utilisés et se sont parfaitement adaptés aux remblais en matériaux intermédiaires (type 3 au sVoirstar
CONSTRUCTION DU POSTE RTE DE AYRES
Dans le cadre de ce projet, deux murs en remblai renforcés à parement minéral devaient être réalisés. Le projet consistait en 2 ouvrages en rembVoirstar
CONSTRUCTION DU SIÈGE SOCIAL – GROUPE CHARIER
Dans le cadre de ce projet, la société France MACCAFERRI a réalisé un habillage de façades ainsi qu’un ensemble de murs libres en gabions éléVoirstar
CONSTRUCTION D’UN ENSEMBLE IMMOBILIER
Dans le cadre de cet aménagement immobilier, la société France MACCAFERRI a fourni un ouvrage de soutènement en remblai renforcé de type TerramesVoirstar
CONSTRUCTION D’UNE PASSERELLE BUS, PÉAGE DE L’ILE DE RÉ
Maccaferri a réalisé les prestations de dimensionnement, de fourniture et pose des ouvrages. L’ouvrage est un remblai renforcé à parement minérVoirstar
CONSTRUCTION MÔLE DU PORT DE PÊCHE
Afin de protéger le pied du quai contre l’affouillement généré par les hélices des bateaux, Sogea Satom CI, EMCC CI et Maccaferri ont proposé Voirstar
CONSTRUCTION POSTE RTE DE PRALONG
La société Charles Queyras a sollicité Maccaferri pour la fourniture et la pose des gabions éléctrosoudés. Les murs de clôture ont une hauteur Voirstar
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Voirstar
CREATION BASSIN D’EAU PLUVIALE SUR DES RESIDUS DE BAUXITE
Altéo est engagé dans une démarche de réduction de ses impacts sur l’environnement, parmi ces projets, le site de Mange-Garri devait être dotéVoirstar
CRÉATION D’UNE RAMPE D’ACCÈS VOIE SNCF
C'est pour la création de la rampe d'accès que Maccaferri a été sollicité pour dimensionner, fournir et mettre en œuvre les ouvrages de Voirstar
Création d’une voie verte – itinéraire cyclable – Rochecorbon, 37
Les ouvrages de soutènement ont été réalisés en remblai renforcé Terramesh Vert à parement végétalisé. Le Terramesh vert est un grillage comVoirstar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basVoirstar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonVoirstar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeVoirstar
DÉPLACEMENT DIGUES SUITE À CONSTRUCTION DE LA NOUVELLE LIGNE TGV
Sur la rive droite, à Lunel, la digue définitive est conçue pour être déversante sur un linéaire de 150 m. En amont et en aval, la digue est racVoirstar
DÉVIATION DE MONTAGNAC RD613
La solution retenue a été celle de France Maccaferri, le Terramesh® minéral : elle consiste en un parement minéral de 50cm d’épaisseur en moyeVoirstar
DÉVIATION RN116 VALLÉE DE LA TÊT
La solution retenue a été celle proposée par France Maccaferri : une solution inédite en France a été développée spécialement pour le projet,Voirstar
Digue déversante de Lauris – Tranche 3 – Lauris, 84
La maitrise d'œuvre s'est tournée vers une solution en gabions pour protéger de l'érosion le parement aval de la digue déversante.SelVoirstar
DIGUE ENTRE LE PONT DU LAY ET LA PERGOLA
La solution choisie s'est portée sur du Macmat-R ayant pour fonctions de protéger contre l'érosion superficelle des digues. Le MacMat-R estVoirstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tVoirstar
DOMAINE SKIABLE DE LA NORMA-GARE D’ARRIVÉE TSD DE LA REPOSE
La solution technique retenue est la mise en place d’écrans paravalanches de type filet mono-ancrage Dk2 fixés par ancrages, disposé sur 2 rangéVoirstar
DOUBLE TRACK RAILWAY DENCHAI-CHIANGRAI-CHIANGKHONG
After receiving all requirement from client, we've proposed our Macmat for slope protection. The advantages of Macmat are fast and easy installatiVoirstar
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Voirstar
EBOULEMENTS RD437 CASTELNAU TURSAN
Dans ce contexte, Spie Batignolles Valérian a sollicité France Maccaferri afin de proposer une solution en mesure de conforter les zones éboulées,Voirstar
ÉCOQUARTIER FLUVIAL DE L’ÎLE SAINT DENIS
Dans le cadre de ce projet, trois murs de soutènement en protection de berges en gabions double torsion plastifiés devaient être réalisés : un muVoirstar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Voirstar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeVoirstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aVoirstar
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cVoirstar
EXTENSION DU PARC DES CHANTERAINES
Le Conseil Général 92 a choisi les cages gabions double torsion pour leur facilité à laisser voir les matériaux de remplissage. La pierre de rempVoirstar
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueVoirstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toVoirstar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creVoirstar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theVoirstar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineVoirstar
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cVoirstar
HABILLAGE GABION MAGASIN DECATHLON CALAIS
Maccaferri a été sollicitée et a proposé un habillage en cages gabions double torsion revêtu de Galfan. Le grillage constituant les gabions est cVoirstar
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeVoirstar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysVoirstar
HELLOMAC – TRAVAUX DE SÉCURISATION DE LA RD 900 – LA ROCHAILLE
Toujours dans la recherche d'innovation, Maccaferri a créé HELLOMAC, un système d’alerte intelligent en cas d’impact. HELLOMAC est une soluVoirstar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useVoirstar
ILE DE LOISIRS DE LA CORNICHE DES FORTS À ROMAINVILLE
Sur des ouvrages de hauteurs plus importantes (Rampe PMR et Belvédère, relié par une passerelle), Maccaferri a proposé d'utiliser le TerrameshVoirstar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawVoirstar
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystVoirstar
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeVoirstar
LA NOUVELLE ROUTE DU LITTORAL
La solution définie par la maitrise d’œuvre pour les digues côté terre était un talus raidi par géosynthétiques avec un parement en gabions dVoirstar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyVoirstar
LIAISON A16 / RN42 – RECONFIGURATION DU DIFFUSEUR N°31
Dans le cadre de ces aménagements, la société France MACCAFERRI a réalisé une étude proposant un mur de soutènement en gabions double torsion dVoirstar
Liaison RD6185 / Route de Cannes – Echangeur de la Paoute – Grasse, 06
L'entreprise Eiffage a confié à Maccaferri le dimensionnement, la fourniture et la pose des différentes solutions pour la création de l'éVoirstar
LIGNE 935 000 MIRAMAS A ESTAQUE LIGNE DE LA CÔTE BLEUE
Les travaux de confortement rocheux concernaient la tranchée et le versant rocheux entre les PK 867+265 au PK 867+522. NGE Fondation a fait appel à Voirstar
LIGNE SNCF DES ALPES LOT1& LOT2
Maccaferri a été sollicité pour deux lots par NGE et GGM pour dimensionner et fournir plusieurs lignes d'écrans pare blocs d’énergie compriVoirstar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineVoirstar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Voirstar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeVoirstar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iVoirstar
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Voirstar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipVoirstar
LYCÉE INTERNATIONAL – SAINT GERMAIN EN LAYE
Dans le cadre de ces aménagements, la société France Maccaferri a réalisé plusieurs ouvrages de soutènement en mur poids gabions électrosoudésVoirstar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallVoirstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiVoirstar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesVoirstar
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Voirstar
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moVoirstar
MERLON DE PROTECTION SECTEUR DE LA COLLE DU MONT GROS / BON VOYAGE
A la demande de la société Garelli, la société France MACCAFERRI a réalisé une étude portant sur la réalisation d’un merlon pare-bloc par unVoirstar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesVoirstar
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
Le Terramesh® system est un système associant un gabion de façade à une nappe de renfort en grillage continue du parement. La partie gabion assureVoirstar
MISE EN SÉCURITÉ DE LA RD96 – FALAISE MIRABEAU
La Société EPC FRANCE a fait appel à Maccaferri afin de trouver des solutions qui s'intègrent parfaitement dans le paysage. Pour réduire l’Voirstar
MITIGATION MEAURES NEAR PANGI BRIGDE APPROACH, HIMACHAL PRADESH
The solutions for critical stretches with the potential risk of rockfall and surficial instability were identified and adopted. Considering the probleVoirstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Voirstar
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walVoirstar
MUR LIBRE ANTI-BRUIT EN GABIONS – SITE PSA
Le mur anti-bruit présente une longueur de 22m et une hauteur constante de 6.5m. Des poteaux raidisseurs ont été mis en œuvre à l’intérieur deVoirstar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retVoirstar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thVoirstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thVoirstar
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Voirstar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Voirstar
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Voirstar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitVoirstar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Voirstar
NOUVELLE INSTALLATION DE STOCKAGE DE DÉCHETS NON DANGEREUX
Compte-tenu de la configuration du projet (zones en remblai) et des contraintes du site (souhait de réutilisation des matériaux), ce sont des solutiVoirstar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoVoirstar
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVoirstar
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVoirstar
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVoirstar
OUVRAGE DE BANGO
Dans le cadre de la réalisation du canal, le groupement EGIS eau et IDEV Ic a intégré aux ouvrages hydrauliques des solutions gabions durables ; Voirstar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshVoirstar
PARC DE LA MOGÈRE
Les ouvrages hydrauliques ont consisté en 4 déversoirs : BR2-BR4, BR4-BR5, BR5-BR6 et BR7-zone de dissipation. Les talus amont et aval ont été prVoirstar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Voirstar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiVoirstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Voirstar
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAVoirstar
PONT SIMONE VEIL
Dans le cadre des travaux de fondation des appuis, des études relatives aux problématiques des affouillements sur les sols au droit des piles ont éVoirstar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofVoirstar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofVoirstar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rVoirstar
PROJET D’INTERVENTION D’URGENCE CONTRE LES INONDATIONS
En mai 2019, avant que l’inondation n’atteigne son apogée, la ville était capable de créer des barrières de contrôle des inondations en utiliVoirstar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Voirstar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aVoirstar
PROTECTION CONTRE LES COULÉES DE DÉBRIS RM 2205 VALLÉE DE LA TINÉE
Maccaferri a été sollicité pour dimensionner, concevoir, fabriquer et fournir un écran débris flow (DF) capable de retenir d'importantes coulVoirstar
Protection contre les éboulements rocheux de la RD64 – Ventabren, 13, France
Pour la sécurité à long terme des infrastructures en aval de la falaise, Maccaferri a pu fournir une barrière RB 70, d'une capacité énergétVoirstar
PROTECTION DE BERGES – LA BOLLÈNE EN VÉSUBIE
Une solution de confortement de berge par un massif en sol renforcé a été retenue. En pied, le talus a été raidi à 45° de pente moyenne sur envVoirstar
PROTECTION DE BERGES – LE FOURCAT
La société France MACCAFERRI a réalisé une étude proposant un ouvrage de défense de berge. Le confortement de berge est assuré par la mise en pVoirstar
PROTECTION DE BERGES A L’ENTRÉE DES GORGES-VESUBIE
Le confortement et la protection de berge sont assurés par la mise en place d’un massif en sol renforcé par Terramesh System reposant sur une protVoirstar
PROTECTION DE BERGES SUITE TEMPÊTE ALEX 2020 – BARRAGE DU SUQUET
France MACCAFERRI a réalisé une étude proposant un ouvrage de défense de berge de 96m de longueur. Le confortement de berge est assuré par la misVoirstar
PROTECTION DE BERGES – M2565 – DÉPÔT CACHAT
Une solution de confortement de berge par un massif en sol renforcé a été retenue, pour rétablir le talus d'une douzaine de mètre de hauteur.Voirstar
PROTECTION DE BERGES – M2565 – DÉPÔT CACHAT
Une solution de confortement de berge par un massif en sol renforcé a été retenue, pour rétablir le talus d'une douzaine de mètre de hauteur.Voirstar
PROTECTION DES BERGES DU BIEF DE NIFFER : 2019-2021
Après des années de stress hydraulique qui a entraîné la détérioration du canal Niffer, les VNF se sont tournés vers Maccaferri dans le cadre dVoirstar
PROTECTION DES DIGUES
En cas de submersion, un ouvrage classique subit, en effet, un phénomène d’érosion, avec le risque d’apparition de brèches et, dans l’hypothVoirstar
PROTECTION DU CNPE DU TRICASTIN– PARADE MC6
La solution technique retenue consiste en un abaissement de l’arase supérieur de la digue, pour créer une zone localisée de surverse. Côté terrVoirstar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Voirstar
R375-CONTOURNEMENT NORD DE VALENCIENNES – TRÉMIE JEAN-JAURÈS
L’aménagement consiste en la réalisation d’un ouvrage du côté nord de la trémie. Le mur est disposé en terrasses et présente une hauteur vaVoirstar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netVoirstar
Rampe d’accès à une passerelle sur l’Autoroute A1, Dugny, 93
Le groupement de conception réalisation mandaté par Colas GC a confié la réalisation des rampes d'accès à l'entreprise Tersen qui a faitVoirstar
RD 900/A PR 14+730 LIEU DIT ESCLANGON
La société EPC FRANCE s'est tournée vers Maccaferri qui bénéficie d’une gamme importante de solutions dans le domaine de la protection contVoirstar
RD 93 ESPENEL SECTEUR 2 – PROTECTION CONTRE LES CHUTES DE PIERRES
La société Maccaferri a été choisie pour fournir les écrans pare-blocs : ce sont cinq lignes d'écrans EPFM 5000 qui ont été installées. LVoirstar
RD 947 – RACCORDEMENT AU PONT DU GOURET
Maccaferri a été sollicité par l'entreprise Guiramand pour dimensionner, fournir et installer ces deux ouvrages en remblais renforcés. Les ouvVoirstar
RD30 – BELLE ILE EN MER
La société France MACCAFERRI a été consulté par l’entreprise Colas pour fournir et mettre en œuvre des murs poids en gabions. La structure du Voirstar
RD35 TRAVAUX DE SECURISATION CANYON ET TUNNEL DES ECOUGES
Quelques saisons de travaux ont d’ores et déjà permis de sécuriser la zone en traitant les blocs instables les plus volumineux par purges, minageVoirstar
RD38 – CONFORTEMENT RAVIN DE LA CHAUDIERE SAINT EUSEBE, 74, FRANCE
La solution en remblai renforcé à parement végétalisable Terramesh Vert a été retenue pour son efficacité technique, sa rapidité et sa simplicVoirstar
RD980 RECTIFICATION DE VIRAGES
Initialement, le projet prévoyait de conforter les talus par réalisation de parois clouées. France Maccaferri, sollicité par l’entreprise TETRA,Voirstar
RÉALISATION DES CULÉES DU PONT 7ÉME ET 9ÈME TRANCHE
La réalisation des culées du pont ont été réalisées en remblai renforcé à parement vertical en béton et c’est la solution Macres® de FrancVoirstar
RÉALISATION NOUVEAU CASIER DE STOCKAGE DE DÉCHETS NON DANGEREUX
Dans ce cadre, une digue de pied a été réalisée pour le site 6. Des solutions de type remblais renforcés ont été retenues pour assurer la stabiVoirstar
Réaménagement du diffuseur de Mougins – Autoroute A8 – Mougins, 06
Les différentes gammes de produits Maccaferri ont permis de couvrir la plupart des besoins du chantier.Le mur en remblai renforcé a été réalisé Voirstar
RECONSTRUCTION DU VIRAGE DE LA MADONE RM94
Après un nettoyage de la zone en purgeant les blocs instables et en lissant la surface du glissement, un remodelage du pied de glissement a été enVoirstar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiVoirstar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizVoirstar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininVoirstar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceVoirstar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Voirstar
RENFORCEMENT D’ENROBÉ ROUTE DÉPARTEMENTALE VAR ESTEREL
La géogrille est destinée à allonger la durée de service de la nouvelle chaussée d'environ 20 %. En limitant la fatigue de l'enrobé soVoirstar
RENFORCEMENT DE CHAUSSÉE GIRATOIRE DE YESSUVITO
Du PK2+418 au PK2+458 (y compris le giratoire de Yessuvito), 1575 m2 de tronçon étaient en pavés. La première étape consistait à traiter les fisVoirstar
RENFORCEMENT DE LA COUCHE DE FORME DE LA RN4
Dans un premier temps, un tapis de drain granulaire a été installé au niveau de la PST (Partie Supérieure des Terrassements) afin de capter les flVoirstar
RENFORCEMENT DE PISTE CYCLABLE
Afin d'atténuer considérablement l'impact des tassements différentiels sur les couches supérieures de chaussées et ainsi réduire la fissVoirstar
RENFORCEMENT PAR GÉOGRILLE PARACHUTE DU STADE DE PORTE-PÈRES
La société Maccaferri a été contactée par la société ARTDAN afin de proposer une solution de renforcement par géogrille permettant de sécurisVoirstar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aVoirstar
REPRISE D’UN SOUTÈNEMENT PLACE DU COLLÈGE
Au lieu de reconstruire un mur de toute hauteur à l'identique du mur initial, il a été décidé de le scinder en deux murs afin d'aménagerVoirstar
RESEAU HYDRAULIQUE REGIONAL AQUA DOMITIA
Dans ce contexte, plusieurs tronçons nécessitaient la stabilisation de talus lors de la traversée de différents cours d'eau et voiries. S'Voirstar
RÉSIDENCE CLOS DES OLIVIERS
Cet ouvrage de soutènement est un remblai renforcé de type Terramesh Minéral, avec un parement minéral de 30cm d’épaisseur en tête et de 50cm Voirstar
RESTAURATION DES BERGES DE L’ORB
Afin de renforcer la protection anti-affouillement au niveau des zones sensibles, des matelas gabion d’épaisseur 30cm ont été disposés en fond dVoirstar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofVoirstar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedVoirstar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyVoirstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeVoirstar
RN164 SECTION CENTRE PLÉMET
Le mur de soutènement a une hauteur variant entre 2m et 6m et une longueur de 250 m. Il est incliné de 6° sur la verticale pour une meilleure stabiVoirstar
RN193 ECHANGEUR E1 LIAISON BASTIA FURIANI
L’entreprise Corse Travaux (groupe Vinci), en charge des travaux, a choisi de consulter et de faire usage de l’expertise de Maccaferri pour dimensVoirstar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Voirstar
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedVoirstar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RVoirstar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mVoirstar
ROUTE DE LA CORNICHE 2X2 VOIES
L’entreprise EIFFAGE SENEGAL a proposé une solution Terramesh System, afin d’intégrer l’ouvrage dans le site protégé de la pointe des AlmadiVoirstar
ROUTE D’ACCÈS AU BORÉON-TEMPÊTE ALEX OCTOBRE 2020 : GLISSEMENT 1
De gros moyens matériels ont été mis en œuvre par les entreprises pour mener à bien ce chantier dans un temps record. Des ateliers de criblage etVoirstar
ROUTE D’ACCÈS AU BORÉON-TEMPÊTE ALEX OCTOBRE 2020 : GLISSEMENT 2
De gros moyens matériels ont été mis en œuvre par les entreprises pour mener à bien ce chantier dans un temps record. Des ateliers de criblage etVoirstar
ROUTE D’ACCÈS AU BORÉON-TEMPÊTE ALEX OCTOBRE 2020 : GLISSEMENT 6
De gros moyens matériels ont été mis en œuvre par les entreprises pour mener à bien ce chantier dans un temps record. Des ateliers de criblage etVoirstar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshVoirstar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Voirstar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Voirstar
SÉCURISATION DE LA LIGNE FERROVIAIRE ENTRE BREIL-SUR-ROYA ET TENDE
Afin de sécuriser le talus sur lequel repose un ouvrage SNCF (un mur en arcatures de 70 m de long sur lequel circule la ligne ferroviaire), l’entreVoirstar
SÉCURISATION DE LA PISTE D’ACCÈS AU LIEU-DIT LE VALLON DES PINS
La société Tetra a fait appel à France Maccaferri afin de sécuriser une surface de 1520m², avec des hauteurs allant de 5m à 18m. Une solution deVoirstar
SÉCURISATION DE LA RD6002 AU HAMEAU DES BLANQUERIES
De nombreuses études complexes ont été réalisées pour aboutir à la pose de 2 niveaux de géogrilles de résistance extrêmement élevée (1500 kVoirstar
SÉCURISATION DE LA ROUTE M2565 – LE COUGNE
France Maccaferri a été sollicitée par l'entreprise Garelli pour dimensionner, concevoir, fabriquer et fournir un écran débris flow (DF) capaVoirstar
SÉCURISATION DU BARRAGE DU PLANAS
Le choix d’une rehausse de la digue actuelle par l’aval est motivé d’une part par la réalisation des travaux à l’abri de la digue existanteVoirstar
SECURISATION RM2565 ROUTE ACCES VALLEE DE LA VESUBIE
Maccaferri a été sollicitée pour proposer plusieurs types de solutions de protections contre les chutes de blocs. Suite aux 1ères investigations, Voirstar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VVoirstar
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryVoirstar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeVoirstar
SMITHS FERRY SR-55 ERDOX AVALANCHE
The Betonform/Maccaferr Erdox single anchor snow stabilization structure was the perfect product for this scenario. The single cable anchors were drilVoirstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designVoirstar
SOUTÈNEMENT TALUS INTERMARCHÉ DE POUILLON
Maccaferri a dimensionné un ouvrage de soutènement en remblai renforcé parement végétal, le Terramesh Vert, système modulaire pré-assemblé en Voirstar
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplVoirstar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byVoirstar
Stabilisation du casier à sédiments du Polder de Brest – Brest, 29
La société Maccaferri a été sollicitée par la société SDI pour une solution de stabilisation par géogrille pour recouvrir le casier à sédimeVoirstar
STABILISATION D’UN GLISSEMENT DE TERRAIN VILLAGE DE LANSLEBOURG
Sur la base des données identifiées sur le rapport établis la Maitrise d’œuvre, FM a réalisé une note technique pour l’entreprise TETRA, danVoirstar
STADE NAUTIQUE DE VAIRES SUR MARNE JO PARIS 2024
Si le parcours de canoë-kayak slalom est complètement artificialisé en béton, les canaux d’amenée reliant la raquette d’arrivée au lac sont Voirstar
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaVoirstar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersVoirstar
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiVoirstar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Voirstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaVoirstar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bVoirstar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengVoirstar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionVoirstar
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacVoirstar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prVoirstar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slVoirstar
TIGBAO – STA. FE – SAN MIGUEL ROAD TACLOBAN ROCKFALL PROTECTION
To address challenges faced by Tacloban City's access roads, Maccaferri Philippines collaborated with the Department of Public Works and Highways Voirstar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxVoirstar
TRANCHÉE DE MONTAUD LIGNE SNCF DES CÉVENNES
Maccaferri a été sollicitée par l'entreprise STAM en charge de réaliser les travaux de confortement de la paroi rocheuse sur la commune de SauVoirstar
TRAVAUX D’AMÉNAGEMENT DES ÉVACUATEURS DE CRUE
En appui du bureau d’études ANTEA et de l’entreprise NGE Guintoli, Maccaferri a participé au dimensionnement des ouvrages, et a réalisé la fouVoirstar
TRAVAUX D’ÉDIFICATION D’UNE DIGUE DE DÉFENSE CONTRE LA MER
La digue de retrait s’étend sur un linéaire de 3200m entre l’anse des Boucholeurs et la pointe du Rocher (commune d’Yves). L’étude a permisVoirstar
TRAVAUX DE CONFORTEMENT DU GLISSEMENT DU CANAL DE GORGIA
Dans le cadre de ce chantier, la solution technique proposée devait être efficace, rapide à mettre en œuvre et permettre de réutiliser les matérVoirstar
TRAVAUX DE MISE EN SÉCURITÉ DU VERSANT AMONT DE LA RM2205
Dans le cadre du marché à bons de commande du dé-partement 06, Maccaferri a été sollicité par l'entreprise Garelli pour la fourniture d'Voirstar
TRAVAUX DE PROTECTION AU HAMEAU DU CHAMBON
L'écran installé en deux lignes de 70ml sur une hauteur de 4m est un écran dynamique de type RB2000 capable de résister à l'impact d'Voirstar
TRAVAUX DE REFECTION DE LA DIGUE DU DAIN
Dans le cadre de ces travaux de réfection de la digue, un géomatelas tridimensionnelle anti-fouisseur devait être installé sur le talus supérieurVoirstar
Travaux de requalification des allées de la liberté à Cannes, Cannes (06)
En réponse à la nécessité de renforcer la sécurité dans les espaces publics, Maccaferri a développé un système de prévention contre les intrVoirstar
TRAVAUX DE SÉCURISATION DE LA RD 900 SUR LE SECTEUR DE LA ROCHAILL
Dans le cadre du MBC du département des Alpes de Haute Provence, la Société EPC France a fait appel à France Maccaferri pour son large choix de soVoirstar
TRAVAUX DE SECURISATION ET DE CONSOLIDATION DU TALUS DES BERGERS
Dans le cadre de la consolidation du talus des Bergers, la commune de l'Alpe d'Huez a souhaité une solution de confortement permettant d’auVoirstar
TRAVAUX PRÉPARATOIRES GARE DE MÉTRO GRAND PARIS-AÉROPORT ORLY
La société Maccaferri sollicitée par l’entreprise Eurovia a proposé de réaliser un remblai renforcé parement minéral de type Terramesh® SystVoirstar
TSD DES ARCELLINS
France Maccaferri a dimensionné les soutènements des remblais en Terramesh® vert, solution avec un parement végétal associé à une nappe de renfVoirstar
VIDANGE ET GESTION SÉDIMENTAIRE DE LA RETENUE DU BARRAGE DE VEZINS
La solution mur-poids en gabion a été adoptée pour former des casiers de stockage de sédiments : les gabions assurent le soutènement mécanique Voirstar
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingVoirstar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comVoirstar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mVoirstar
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfalVoirstar
ZAC DE LA BALLASTIERE SUD HABILLAGE FACADE IMMEUBLE
Maccaferri a réalisé la fourniture et la pose de l'habillage en gabion réalisé avec des panneaux électrosoudés constituant le parement minéVoirstar
ZAC DE LA COURROUZE
France Maccaferri a été choisie pour participer au dimensionnement du merlon, approvisionner les fournitures mais également pour la mise en œuvre Voirstar
Réaménagement des berges de la Frayère, 06
France Maccaferri a dimensionné, fourni et mis en œuvre un ouvrage de soutènement sur chaque rive des berges de La Frayère sur un linéaire d'Voirstar
contactez nos experts
Nous sommes votre partenaire gagnant pour le monde complexe des constructions civiles et industrielles. Notre large gamme de produits et solutions répondent aux différentes exigences techniques du secteur : drainage, imperméabilisation des structures et des revêtements, économie d’énergie pour le confort de l’habitat et questions relatives à l’environnement.