Facebook pixel

Lower Campbell Repair

Home > ιστορίεσ επιτυχίασ > Lower Campbell Repair

Channelling Works

2012

FLAGSTAFF - ARIZONA - U.S.A.

COCONINO COUNTY

TIFFANY CONSTRUCTION COMPANY

KIMLEY HORN & ASSOCIATES

Lower Campbell Repair

Problem

In 2001, the Schultz fire left the eastern slopes of the San Francisco Peaks barren and prone to flash flooding.

The Campbell Avenue ditch needed to withstand the larger water flows caused by the lack of vegetation during the monsoon season. Maccaferri’s gabions were chosen to provide erosion control protection on the channel’s banks.

The rock-filled gabion baskets could guarantee the protection needed for the hydraulic forces while providing a pleasing aesthetic.

Solution

The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base.

MaxTex® H 60.1 is a non-woven geotextile that was used in conjunction with the gabions to filter the fine soils from the backfill and prevent them from migrating to the gabions. 

Strict adherence to the installation guide was required to achieve the performance and aesthetics required of the project. Maccaferri provided installation training and job site visits. Technical assistance was also given during the design phase.

Used Products

Συρματοκιβώτια
Συρματοκιβώτια
Το Συρματοκιβώτιο της Maccaferri παράγεται από διπλής πλέξης “DT” χαλύβδινο πλέγμα, σε διάφορες διαστάσεις, χωρισμένο ομοιόμορφα σε εσωτερικές κυψέλΔείτε
star

Επικοινωνήστε με τους ειδικούς μας σήμερα

Η ομάδα των ειδικών μας είναι έτοιμη και πρόθυμη να σας βοηθήσει: είτε έχετε ερωτήσεις σχετικά με τα πιο πρόσφατα προϊόντα μας είτε αναζητάτε εξατομικευμένες λύσεις για τις δικές σας προκλήσεις, είμαστε μόλις ένα κλικ ή ένα τηλεφώνημα μακριά.

Image
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.