Facebook pixel

5 Years Later, Maccaferri’s PoliMac Coated Gabions Prove Their Strength at Aston Anyer

Home > News > 5 Years Later, Maccaferri’s PoliMac Coated Gabions Prove Their Strength at Aston Anyer
09 April 2025

5 Years Later, Maccaferri’s PoliMac Coated Gabions Prove Their Strength at Aston Anyer

Since 2020, this structure has remained not only reliable as a breakwater, but Maccaferri’s PoliMac coated gabions have continued to perform optimally and positively impact the coastal ecosystem. 🏗️ Designed to address infrastructure challenges in the Serang area, Banten, this project now stands as solid proof of high-quality design, materials, and execution.

🎥 See the proof in our latest video!

Project Highlights:
📍 Location: Serang, Banten
📅 Year of Implementation: 2020
⚙️ Solution: Breakwater
🧱 Product: PoliMac Coated Gabions



Looking for Long-Lasting Results Like This?

Long-term success doesn’t happen by chance — it’s the result of careful planning, the right materials, and strong partnerships with experienced teams.

👉 Contact us to discuss your next project or learn more about how we build solutions that last.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.