44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massViewstar
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Viewstar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecViewstar
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Viewstar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MViewstar
ANTIBUND SEA EROSION PROTECTION
The Contractor has suggested the use of Gabion Mattress as an Apron Protection Work for the bunds which is one of the most practical and viable solutViewstar
ANTIBUND SEA EROSION PROTECTION, SHELL HAZIRA
The contractor has suggested the use of gabion mattress as an apron protection work for the bunds which is one of the most practical and viable solutiViewstar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Viewstar
ASH POND LINING WITH GEOMEMBRANE AT NELLORE
Considering the importance of the project and protection of the environment, Maccaferri suggested the use of geomembrane MacLine® SDH HDPE 1.0 mm tViewstar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tViewstar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosViewstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 12 (R) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 2 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 5 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 6 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxViewstar
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaViewstar
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TViewstar
BALLAST STABILIZATION USING GEOSYNTHETIC SOLUTIONS
The proposed solution is ballast stabilization using biaxial extruded geogrid i.e. Maccaferri’ s MacGrid EG and Polypropylene Multifilament Woven GeViewstar
BANK PROTECTION FOR RIVER TAPI, SURAT
The conventional methods were not able to provide a technically and commercially viable solution to the heavy erosion problem. The consultant CWPRS fiViewstar
BANK PROTECTION FOR VENNAR RIVER
The PWD Tamil Nadu, decided to go for an innovative method of providing a gabion structure in order to protect the river bank as well as to control erViewstar
BANK PROTECTION WORK AT GATHA BHADERWAH, J&K
Gabions were proposed to construct the retaining wall because of its free draining nature and speed in construction. Another advantage of gabions was Viewstar
BANK PROTECTION WORK ON NEERU RIVER
Gabions were proposed to construct the retaining wall because of its free draining nature and speed in construction. Another advantage was the effectiViewstar
BANK PROTECTION WORKS ALONG RIVER GANGA NEAR DAKSHINESHWAR TEMPLE
Maccaferri proposed a gabion toe wall along with a gabion mattress revetment over the slope. MacBags (geotextile bags) were used as filling material bViewstar
BANK PROTECTION WORKS IN RIVER GANGA AT BUDGE BUDGE
It was important to carryout the construction planning so that the system sustained all the worst loading conditions. The design thickness calculationViewstar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsViewstar
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Viewstar
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Viewstar
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tViewstar
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bViewstar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trViewstar
BHAVNAGAR PAVEMENT STABILIZATION
R & B department referred the problem to Maccaferri for the improvement of 14 km length proposed road. Ease and speed of construction was a key elemenViewstar
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Viewstar
BLANKET THICKNESS REDUCTION USING GEOSYNTHETIC SOLUTION FOR ADANI
Geosynthetic solutions play a vital role as alternative to conventional approach in track bed stabilization projects. The design was based on modifiViewstar
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aViewstar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Viewstar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Viewstar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshViewstar
BRIDGE PROTECTION WORKS AT KOSI RIVER
Guide bund works and afflux bund were proposed with gabion mattress. Gabion mattress adopted here was of thickness 0.3m, with length varying as 3m, 2mViewstar
BRIDGE PROTECTION WORKS FOR RIVER YAMUNA
The river training works were designed for a design discharge of 14866 cum/s and a maximum velocity of 3.3 m/s. The solution offered made use of 1 sinViewstar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenViewstar
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteViewstar
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinViewstar
BYTCO JUNCTION ROB
Reinforced Soil Wall with discrete concrete panel as facia and Double Twisted Hexagonal mesh as reinforcement was selected as the system. Square discrViewstar
CANAL LINING IN HARYANA
The client was looking for a product which can replace the conventional granular gravel layer & arrangement of network of perforated pipe provided undViewstar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisViewstar
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiViewstar
CAUSEWAY CONSTRUCTION WITH GABIONS ON DHADHAR RIVER
The embankment being located in high flood zone, an inherently permeable and free draining structure would be technically suitable. Maccaferri suggestViewstar
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installViewstar
CHECK DAM FOR VAMANAPURAM RIVER
The Irrigation department, decided to construct a check dam across Vamanapuram river in the downstream location of the infiltration gallery. The maiViewstar
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleViewstar
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lViewstar
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6 feet tall. The proposed channel sidewalls will be stabilized with gabiViewstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Viewstar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Viewstar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightViewstar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Viewstar
CONSTRUCTION OF EIGHT LANE VADODARA-MUMBAI EXPRESSWAY IN THE STATE
Out of the various alternatives, Reinforced Soil (RS) Wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcement was selViewstar
CONSTRUCTION OF GEOTEXTILE REEF AT THE COAST OF MIRYA BAY
In order to mitigate the problem of erosion, Maharashtra Maritime Board (MMB) proposed the construction of a multipurpose submerged geotextile reef atViewstar
CONSTRUCTION OF LEFT AFFLUX BUND AT JOSHIYARA BARRAGE
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL), Govt. of Uttarakhand, had decided to reconstruct the left afflux bund using prefilled / in-situ filled gabiViewstar
CONSTRUCTION OF ROB AT DWARKA
As per Maccaferri’s standard block, two types of blocks were proposed- one with flat facing and other one with curvature facing. Keeping the aesthetViewstar
CONSTRUCTION OF RS WALLS FOR ANCILLARY BUILDINGS
RS Wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcement was proposed to the contractor for the above problem due tViewstar
CONSTRUCTION OF RS WALLS FOR APPROACHES OF ROB’S/VUP’S OF NH-49
Reinforced Soil (RS) Wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcement was proposed for the above problem due tViewstar
CONSTRUCTION OF UNPAVED ROAD
The solution by CESC was to construct an embankment (with the existing local soil) 1.5 m high having a top width of 11m. The middle 7 m width (road wiViewstar
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Viewstar
CRUSHER WALL AT SERAJUDDIN MINES (JODA) ,ORISSA
A 22 m high vertical Terramesh TM System wall was proposed. The inherent flexibility of the Terramesh System TM made it an ideal choice. The design wViewstar
CULVERT PROTECTION WITH GABION AT KURAL-SHANPUR-SOKHADA RAGHU ROAD
The embankment being located in high flood zone, an inherently permeable and free draining structure would have been technically suitable. Maccaferri Viewstar
CUT SLOPE STABILISATION ALONG NEAR KHANDALA TUNNEL PUNE CORRIDOR
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haViewstar
CUT SLOPE STABILISATION NEAR A HOSPITAL AT PONDA,GOA, INDIA
Considering the need to protect the vertical cut, soil retention works with soil nailing was suggested for the above problem. The height to be retainViewstar
CUT SLOPE STABILISATION WORK AT SHRIRAM-THE GATE WAY SEZ (PHASEII)
To retain the cut slope, Maccaferri proposed composite solution of soil nailing with Gabion fascia at bottom and reinforced soil system with TerraMeshViewstar
CUT-SLOPE STABILISATION USING SOIL NAILING AT VILLUKURI
As per geotechnical investigations carried out between KM 43/000 to KM 70/250, rocky strata is overlain by lateritic soil, clayey soil, river and coasViewstar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basViewstar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonViewstar
DEBRIS FLOW MITIGATION MEASURES NEAR KEDARNATH TEMPLE
Considering the extremely challenging site situation and requirement of system that can be dismantled, easy to transport and install, solution with ErViewstar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeViewstar
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeViewstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tViewstar
DISMANTLING WORKS OF UNSTABLE ROCK BOULDER LOCATED AT GAYA, BIHAR
Immediate protection measure for the massive boulder which was in the verge of sliding has been done by wrapping the boulder with High Energy AbsorptiViewstar
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Viewstar
EARTH RETENTION WITH GABION WALL AT EON IT PARK
Considering the site conditions, it was decided to construct a gabion retaining wall to mitigate the specified problem. Maccaferri gabions are rectangViewstar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Viewstar
EROSION CONTROL AT BHAUPUR KHURJA RAILWAY EMBANKMENT
Maccaferri has developed wide range of erosion control solutions that are applicable after judicious assessment of the slope angle and extent of erosiViewstar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeViewstar
EROSION CONTROL MEASURES – VALLEY SIDE – HELANG, UTTARAKHAND
Reinforced soil structure (Maccaferri’s Paramesh system) has been constructed as the road side retention measures. In order to provide the toe sidViewstar
EROSION CONTROL MEASURES ALONG ARIYALUR BYPASS OF NH, TAMIL NADU
To address erosion control, Maccaferri has supplied biodegradable erosion control mat (woven coir mat (BioMac CCW)) and hydraulically applied erosionViewstar
EROSION CONTROL MEASURES ALONG C-Z ROAD, NAGALAND, INDIA
To protect the slope, hydraulically applied erosion control measures comprising of MacFlex HP FGM (HECP), and other agronomic amendments are appliedViewstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aViewstar
EROSION CONTROL MEASURES ALONG NH 39, MANIPUR, INDIA
To protect the slope, hydraulically applied erosion control measures comprising of MacFlex HP FGM (HECP), MacGanics BSM (top soil alternative) and othViewstar
EROSION CONTROL MEASURES FOR HINDALCO’S MINE AT MURI, JHARKHAND
To protect the slope, Maccaferri used Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such as AquaViewstar
EROSION CONTROL MEASURES FOR RAILWAY EMBANKMENT AT LUCKNOW
Maccaferri has suggested the erosion control system consisting of rolled erosion control product (RECP)- MacMat R (steel reinforced synthetic geomat) Viewstar
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionViewstar
EROSION CONTROL MEASURES TRIAL AT HINDALCO’S MURI PLANT
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asViewstar
EROSION CONTROL MEASURES TRIAL AT HINDALCO’S RENUKOOT PLANT
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asViewstar
EROSION CONTROL MEASURES TRIAL AT KANNUR INTERNATIONAL AIRPORT
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control products (HECPs)- MacFlex, MacGanics and other agronomic amendments sViewstar
EROSION CONTROL TRIAL ALONG OOTY STATE HIGHWAY, TAMILNADU
To carry out the trial in identified slope area of 300 sq.m, Maccaferri suggested surface nails (Self drilling Anchors (SDA) of 32mm dia.), 3D erosionViewstar
EROSION CONTROL TRIALS DONE ON RAILWAY EMBANKMENT AT HOSHANGABAD
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asViewstar
EROSION CONTROL TRIALS DONE ON RAILWAY EMBANKMENT, CHATTISGARH
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asViewstar
EROSION CONTROL TRIALS DONE ON RED MUD OB DUMP AT BELAGAVI
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asViewstar
EROSION CONTROL WORKS ON SONA RIVER
A gabion wall was constructed to protect further erosion of the pier of the existing bridge on the Sona river. Slope revetment protection was done usViewstar
EROSION PROTECTION WORKS ALONG BANKS OF BRAHMAPUTRA RIVER
Water Resource Department suggested the use of MacBag® for the bank protection, which is one of the most practical and viable solutions. Maccaferri&#Viewstar
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cViewstar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeViewstar
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueViewstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toViewstar
FLOOD PROTECTION WORKS ON RIGHT BANK OF NARMADA RIVER
Considering the river bank erosion happening constantly in this region and leading to loss of land and property, Maccaferri suggested to go for simpleViewstar
FLY OVER AT PUNJAGUTTA JUNCTION
Reinforced soil wall (RS wall) with concrete panels as facia and ParaWeb as reinforcement was selected as the best solution for the above problem. T-Viewstar
FLYOVER FOR BRIDGE ACROSS CHAKKAI CANAL
Reinforced Soil wall with concrete panels as facia and Paraweb as reinforcement was selected as the best solution in comparison to RS wall with steel Viewstar
FORMATION TREATMENT WORK IN AGARTALA SABROOM BG RAILWAY LINE (NFR)
The consultant proposed woven multifilament geotextile as a separation & filtration purpose in between blanketing & subgrade material along with biaxiViewstar
FOUR LANING OF HYDERABAD – KARIMNAGAR-RAMAGUNDAM ROAD (SH-01)
Maccaferri proposed reinforced soil wall with concrete panels as facia. ParaWeb® as reinforcement was adopted due to its technical and economic advanViewstar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creViewstar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theViewstar
GABION CHECK DAM FOR KILLI RIVER,TRIVANDRUM
The main purpose of constructing the check dam was: 1) To recharge the ground water table and to recoup the water level in the nearby wells adjacent tViewstar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineViewstar
GABION RETAINING WALL AS WING WALL AT NH8 VADODARA-BHARUCH
L & T’s conventional solution was to provide RCC retaining walls as wing walls for minor bridges and culverts. The in-situ soil was clayey in natureViewstar
GABION RETAINING WALL AT IT PARK MAGARPATTA, PUNE
Since black cotton soil is highly sensitive to seasonal moisture content variations and can lead to distress of the structure, foundation replacement Viewstar
GABION RETAINING WALL AT MUMBAI PUNE EXPRESSWAY
Retaining were deemed necessary. Gabions were preferrred because of its free draining nature and speed of construction. Another advantage of the effecViewstar
GABION RETAINING WALL FOR BARRAGE BANK PROTECTION, NASHIK
Gabion retaining walls were provided as the solution. The maximum height of retention for bank protection was 11m. Due to the presence of water, it waViewstar
GABION RETAINING WALLS AT GODA PARK
A gabion wall for retaining the earth was constructed. The main function of a bank protection structure is to provide a substantial interface between Viewstar
GABION WALL AT PANCHKARMA AYURVEDIC HOSPITAL
Considering weak soil parameters and seepage, a flexible free draining structure would be an ideal solution and the same was proposed with gabion wallViewstar
GABION WALL FOR KOLLAM-SHENKOTTA SECTION GUAGE CONVERSION
Gabions were proposed to construct the retaining wall because of its free draining nature and speed of construction. Another advantage was the effectiViewstar
GABION WALLS AT AHMEDABAD VADODARA EXPRESSWAY
Maccaferri provided gabions for the wing walls and culverts since that was the most preferred solution because of its flexibility and free draining naViewstar
GABION WALLS AT SATARA-KOLHAPUR ROAD
Conventional Structures like concrete walls were ruled out since it may require deep foundation because of the existence of the clay. So, gabion wallsViewstar
GABION WALLS FOR KSTP UPGRADATION, KERALA
Consultants LBI proposed three alternatives such as gabion walls, random rubble walls and concrete walls out of which gabion walls were selected becauViewstar
GABION WALLS FOR MUNNAR VATTAVADA ROAD
Taking into consideration the critical situation at site, Maccaferri adopted Gabion for embankment and culverts head walls. The height of the walls whViewstar
GABION WALLS FOR OOTY-METTUPALAYAM ROAD
National Highway Authority of India consulted Maccaferri for the problems faced by the Highway department for widening of existing road and retention Viewstar
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cViewstar
GABION WALLS FOR TRIVANDRUM-PONMUDI ROAD
Gabion retaining walls were provided as the solution. The maximum height of retention for road embankment was 6m. The foundation at site was rocky in Viewstar
GROUND IMPROVEMENT USING PRE-FABRICATED VERTICAL DRAIN ALONG WITH
Considering the extremely challenging site situation in terms of weak, compressible foundation strata, Maccaferri suggested the pre-fabricated verticaViewstar
GUIDE BUND & RIVER PROTECTION WORKS ON RIVER GANGA NEAR ALLAHABAD
Usually, riprap (pitching) is used for river bank and guide bund protection. Thickness of such riprap vary from 0.3m to 2m as per design. Gabion mattrViewstar
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeViewstar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysViewstar
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdViewstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Viewstar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useViewstar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beViewstar
JAIPUR-KISHANGARH EXPRESSWAY
Reinforced soil wall with concrete panels as facia and Paraweb® as reinforcement was selected as the best solution. Three types of panels were used aViewstar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawViewstar
KONKAN RAILWAY (KRCL) ROUTE
Maccaferri Gabion walls with stepped rear face were adopted in many vulnerable stretches of hill cuttings of Konkan Railway. Backfill soil was carefulViewstar
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystViewstar
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeViewstar
LAKE PROTECTION WORKS IN NAVI MUMBAI
The existing UCR Wall had failed to protect the lake banks, and so the client was in favor of an environment friendly solution, so a gabion retaining Viewstar
LANDFILL PROJECT AT GYASPUR VILLAGE
The scope of work for Maccaferri was supplying, laying and joining of the geomembrane (1.5mm thick) at the bottom and on the slopes. The geomembrane cViewstar
LANDFILL PROJECT FOR PINCOL PARA GARULIA MUNICIPAL CORPORATION
The KMDA has designed a landfill which has a total area of about 4168 sqm. The secured landfill consists of 4 slopes of approximately 4.5 m height. 1Viewstar
LANDSLIDE MITIGATION WITH FLEXIBLE STRUCTURES IN JHARKHAND
The State Road Construction Department was on look out for appropriate mass gravity wall for slope stabilisation. Gabion retaining walls were selectedViewstar
LANDSLIDE PROTECTION WORKS WITH GABION RETAINING WALL AT NH-47
National Highway Authority of India asked solutions for the problem to Maccaferri India. They required a speedy solution since the proposed site was oViewstar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyViewstar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineViewstar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Viewstar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeViewstar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iViewstar
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Viewstar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipViewstar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallViewstar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaViewstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiViewstar
MANGALA PROCESSING TERMINAL GABION FLOOD PROTECTION SCHEME
System is designed in such a way that the Gabion retaining wall along with apron & lower revetment can minimize the effect of rainfall, erosion or anyViewstar
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duViewstar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesViewstar
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Viewstar
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moViewstar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesViewstar
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a neViewstar
MITIGATION MEAURES NEAR PANGI BRIGDE APPROACH, HIMACHAL PRADESH
The solutions for critical stretches with the potential risk of rockfall and surficial instability were identified and adopted. Considering the probleViewstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Viewstar
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walViewstar
MUCK DISPOSAL FROM RAMPUR HYDROELECTRIC POWER PLANT
With consideration of specified problem, it was decided to dump the muck on the upper slopes of the Satluj river. To avoid the muck from falling down Viewstar
MUMBAI PUNE EXPRESSWAY – ROCKFALL MITIGATION WORKS AT GHAT SECTION
After conducting detailed engineering investigation and taking geological and geotechnical observations of the experts into consideration, Maccaferri Viewstar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retViewstar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thViewstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thViewstar
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureViewstar
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Viewstar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Viewstar
NEW MODI LEKHNATH 132 KV TRANSMISSION LINE PROJECT
The following Structures had been designed by Maccaferri based on the available river hydrology and topographical information: (1) River Bank ProtectViewstar
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Viewstar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitViewstar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Viewstar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsViewstar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
PARAMESH WALL AT KALIAPANI CHROMITE MINES
Reinforced soil wall was considered as an ideal solution. Paramesh wall system consisting of Terramesh (gabion facia units with an integrated double tViewstar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshViewstar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Viewstar
PAVEMENT STRENGTHENING AT AIRFORCE STATION, KALAIKUNDA
Damaged pavement was required to be repaired by placing an asphalt layer to increase the load carrying capacity of the pavement section so that it caViewstar
PAVEMENT STRENGTHENING AT NADIA – KAPADWANJ – MODASA ROAD
Current pavement was needed to be repaired by placing an asphalt layer to increase the load carrying capacity of the pavement section. However the abiViewstar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiViewstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Viewstar
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAViewstar
POND LINING WORKS AT LANJHA
Considering water seepage and storage problems, an impermeable lining of the pond was the ideal solution. The side slopes of the pond were dressed iViewstar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofViewstar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rViewstar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Viewstar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aViewstar
PROTECTION FROM SEA EROSION USING GEOTEXTILE TUBE IN AMBALAPUZHA
Maccaferri’s expertise and engineering solutions were integrated in this project. The Irrigation department, Govt of Kerala, decided to construct aViewstar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Viewstar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netViewstar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiViewstar
REFURBISHMENT OF SPURS & BANK PROTECTION OF ERODING ZONE IN KULPI
In order to protect bank from waves and current, transverse structures were needed to be provided which will deflect the water away from the river banViewstar
REHABILITATION & WIDENING OF NH-09 HYDERABAD TO VIJAYAWADA SECTION
Gabion retaining walls were provided as the solution for the problem mentioned. The maximum height of retention for road embankment was 5m. Due to theViewstar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizViewstar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininViewstar
REINFORCED SOIL STRUCTURE AT MB ROAD
Reinforced Soil Wall with concrete panels as facia and Geogrid as reinforcement was selected as the best solution for the above problem. Cruciform shaViewstar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceViewstar
REINFORCED SOIL WALL AT JAGATPURA RAILWAY CROSSING
Reinforced Soil Wall with concrete panels as facia and ParaWeb® as reinforcement was selected as the best solution for the above problem. ParaWeb sViewstar
REINFORCED SOIL WALL AT MIDC CHAKAN,
Fill material for retaining wall was proposed to be crushed stone. ParaWeb was chosen as soil reinforcement in view of better resistance to installatiViewstar
REINFORCED SOIL WALL AT WATSON PHARMA, GOA
Maccaferri proposed RS wall with concrete panels as fascia and ParaWeb® as reinforcement for the boundary retaining wall because this system has seveViewstar
REINFORCED SOIL WALL FOR ARRIVAL & DEPARTURE RAMPS AT RGI AIRPORT
Out of the various alternatives available, reinforced soil (RS) wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcemeViewstar
REINFORCED SOIL WALL FOR ASH POND IN BELLARY
Reinforced soil panel wall using Paraweb® (MacRes® system) was proposed to build the embankment within available width. The system is comprised of dViewstar
REINFORCED SOIL WALL FOR HIMMATNAGAR ROB
Out of the various alternatives available, reinforced soil (RS) walls with segmental block as facia and geogrid as reinforcement was selected by the RViewstar
REINFORCED SOIL WALL FOR ROB FOR JNPT DRY PORT AT JALNA
Reinforced Soil (RS) wall system (MacRes) with concrete panels as facia and ParaWeb as reinforcement was selected as the best solution for the above pViewstar
REINFORCED SOIL WALL FOR VUP AT KEMPEGOWDA INTERNATIONAL AIRPORT
Compared to conventional structures, RS Wall system with precast concrete panels as facia and Paraweb as reinforcement was selected as the best solutiViewstar
REINFORCED SOIL WALLS ALONG THE STRETCH OF FIROZABAD & ETAWAH
Reinforced Soil Wall system (MacRes) was proposed over conventional RCC wall due to its economy, flexibility, aesthetics and quick construction. RS WaViewstar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Viewstar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aViewstar
RESTORATION OF GILBERT HILL
Considering the space restrictions at toe of hill, presence of buildings in the vicinity and nearly vertical slopes, secured drapery system with rasteViewstar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofViewstar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedViewstar
RETENTION AND BOX CULVERT PROTECTION WORKS, VADODARA
Maccaferri’s Terramesh system with gabion facia and ParaLink as primary reinforcement and mesh as a secondary reinforcement was selected as the beViewstar
RETENTION WORKS FOR HAJJ HOUSE
Considering the heights to be retained, expected loads, site constraints and client requirements, Maccaferri proposed a Paramesh System which is very Viewstar
RETENTION WORKS FOR JOJOBERA GU EXPANSION
Keeping in mind all the aspects of project, the client decided to go with Maccaferri's products. Considering the scope of project and client'sViewstar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyViewstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeViewstar
RIVER BANK PROTECTION FOR MULA RIVER AT SANGAM BRIDGE
At the location 1, to protect the bungalow as well as bank, a gabion wall (Zn +PVC coated mesh type 10X12; 2.7/3.7 mm wire dia) of height 6m was constViewstar
RIVER BANK PROTECTION FOR TAWI RIVER
Considering the described problem, it was suggested to provide an erosion control structure which will withstand the water forces and control the flooViewstar
ROAD OVER BRIDGE NEAR DIBRUGARH (ROB 15)
For retaining the bridge approaches, Maccaferri proposed ParaWeb® wall system (i.e. reinforced soil system) as the retaining wall. In order to avoid Viewstar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Viewstar
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedViewstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringViewstar
ROCKFALL MITIGATION – KHANDALA (MUMBAI CORRIDOR), MUMBAI–PUNE EW
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haViewstar
ROCKFALL MITIGATION – MONKEY HILL- THAKURWADI STRETCH-116/300 -500
As per the site observations, previous history of rockfall incidents in this area and analysis, a critical location along chainage km 116/300 – 116/Viewstar
ROCKFALL MITIGATION -NEAR ADOSHI TUNNEL, MUMBAI –PUNE EW
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haViewstar
ROCKFALL MITIGATION ALONG NEAR AMRUTANJAN BRIDGE, MUMBAI -PUNE EW
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haViewstar
ROCKFALL MITIGATION ALONG RAILWAY LINE CUT SLOPES-DUDHNOI
Traditional rockfall mitigation solution is using drapery meshes function by controlling the falling rocks behind a containment curtain of drapery mesViewstar
ROCKFALL MITIGATION MEASURES AGAINST FALLING BOULDERS AT GHOLTEER
As per the site observations and previous history of rockfall incidents in this area, existing nallah location between Ch 379+450 km to Ch 379+550 km Viewstar
ROCKFALL MITIGATION MEASURES ALONG KONKAN RAILWAY ROUTE,INDIA
Based upon the problem, different solutions were proposed in this project. To mitigate rockfall from the hill side slopes, mechanically woven hexagonViewstar
ROCKFALL MITIGATION MEASURES AT PATALGANGA VALLEY, UTTARAKHAND
As per the site observations and previous history of rockfall incidents in this area, 4 critical locations are identified as the critical locations baViewstar
ROCKFALL MITIGATION MEASURES FOR HILL SLOPE AT SHRI RAM LAXMAN GAD
Selection of rockfall mitigation was done in such a way that the drapery/netting shall be capable of retaining detached boulders of small as well as lViewstar
ROCKFALL MITIGATION MEASURES FOR PEACOCK PROJECT, RABALE
After studying the geological and topographical details, suitable rockfall mitigation solutions were devised to contain rocks falling from the face. TViewstar
ROCKFALL MITIGATION MEASURES ON HILLSIDE – GULABKOTI, UTTARAKHAND
The selection of system had to be resilient to critical joints, road widening requirement, subsurface water, high seismic forces, and steep topographyViewstar
ROCKFALL MITIGATION WORKS ALONG RAILWAY TRACK – VANGAL AND KARUR
To reduce the risk of falling rock from cut slope of approx. 15m on to the railway line, Maccaferri proposed secured drapery system with raster of naiViewstar
ROCKFALL MITIGATION WORKS ALONG SOUTH-WESTERN RAILWAYS, KARNATAKA
As per the site observations and previous history of rockfall events, multiple locations have been identified as the critical locations. Among these,Viewstar
ROCKFALL MITIGATION WORKS AT SAPTHSHRUNGI
Presence of heavy joint loose rock mass at the top of the cliff, and multiple vertical open joints in rock mass on vertical slope above and around theViewstar
ROCKFALL MITIGATION WORKS AT ST-1 OF TEESTA STAGE-III HEP, SIKKIM
As per the site observations and previous history of rockfall events, the critical location above the spillway tunnel, ST-1 has been identified based Viewstar
ROCKFALL MITIGATION WORKS ON HILLSIDE – HELANG, UTTARAKHAND
The selection of system had to be resilient to subsurface water, high seismic forces, and steep topography. On the hillside, where there is a rocky stViewstar
ROCKFALL MITIGATION WORKS- CS DAM TOP-TEESTA STAGE-III HEP, SIKKIM
As per the site observations and previous history of rockfall events, the critical location above the Chute Spillway(CS) Dam top has been identified bViewstar
ROCKFALL MITIGATION WORKS- DHAULIGANGA HEP STATION, UTTARAKHAND
As per the site observations and previous history of rockfall events, the stretch above the buildings have been identified as the critical location baViewstar
ROCKFALL MITIGATION WORKS- MAT – TEESTA STAGE-III HEP, SIKKIM
As per the site observations and previous history of rockfall events, the critical location above the main access tunnel(MAT) portals for power house Viewstar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RViewstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringViewstar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mViewstar
ROCKFALL PROTECTION WORK AT CCTEB, KHAD CITY RAJGURUNAGAR, PUNE
A rockfall mitigation solution involving secured drapery was installed to capture and contain rocks falling from the face. The close proximity of the Viewstar
ROCKFALL PROTECTION WORKS ALONG RAILWAY LINE VANGAL & KARUR
To reduce the risk of rockfall on to railway line, it was proposed to drape the surface of the exposed cut slope with HEA square panels and chain linkViewstar
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thViewstar
SABARMATI RIVER FRONT DEVELOPMENT PROJECT
Terramesh® system with gabion facia and mesh as reinforcement was selected as the best solution due to its environmental friendliness. The system wViewstar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshViewstar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Viewstar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Viewstar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Viewstar
SHORE PROTECTION OF RIVER MAHANADI
This was a world bank aided project. The project involved launching of pre-filled gabion mattress in India. In the rehabilitation process, the eroded Viewstar
SIX LANING OF GURGAON-KOTPUTLI-JAIPUR SECTION OF NH-8
Maccaferri proposed a better alternative solution of placing a layer of MacDrain® behind the retaining wall, replacing the conventional drainage arrViewstar
SLOPE PROTECTION – ALONG PEDDAR ROAD NEAR MALABAR HILL, MUMBAI
Slope protection measures in the involving toe wall near the slope toe, biodegradable erosion control mat, mechanically woven double twist (DT) mesh wViewstar
SLOPE PROTECTION AT KOTESHWAR MAHADEV TEMPLE
As the temple was located in high flood zone it was necessary to provide retaining structure which is permeable and free draining. Taking in to consViewstar
SLOPE PROTECTION MEASURES – HILL SIDE SLOPE AT BIRAHI, UTTARAKHAND
After a judicious assessment of the site conditions, a combination of slope protection solutions along with a 100m long 3m high gabion toe wall has beViewstar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VViewstar
SLOPE PROTECTION WORKS AT ZIRAKPUR-PARWANOO SECTION NH-22
The highway concessionaire (Himalayan Expressway Ltd), Jaypee approached Maccaferri for providing a solution to overcome the slope hazards. The entirViewstar
SLOPE PROTECTION/ROCKFALL MITIGATION WORKS ALONG BOMDIR LUMLA ROAD
The proposed solutions consist of following systems: Slide stretch: – Loose scaling – MacMat HS(+Bio-Engineering measures) with top anchoring and sViewstar
SLOPE RETENTION -ACCESS RAMP WALL OF ‘THE PROMONT’ HOUSING PROJECT
The solution comprised of Gabion retaining wall (Height – 4.5m to 14.0m) (with base and /or lateral anchoring) with surcharge soil slope of max. 30 deViewstar
SLOPE STABILISATION – TOP WALL OF ‘THE PROMONT’ HOUSING PROJECT
Different combinations were proposed based on wall alignment, space availability, height and insitu strata topography. The general solutions are as fViewstar
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryViewstar
SLOPE STABILISATION- BOTTOM WALL OF ‘THE PROMONT’ HOUSING PROJECT
The solution comprised of nailing (HYSD bars of 25mm dia) with Gabion facia of width 2m. The Gabion facia units had H-frame arrangement at the rear eViewstar
SLOPE STABILISATION- WALL NEAR CDP ROAD OF ‘THE PROMONT’ PROJECT
The solution comprised of nailing with Gabion facia for lower portion and Gabion wall at upper portion of the slope. The gabion facia units at foundaViewstar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeViewstar
SLOPE SURFACE EROSION PROTECTION WORKS
The client was looking for the solution from which they can ensure easy installation and quick growth of vegetation. The soil used to prepare slope Viewstar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoViewstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designViewstar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fViewstar
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplViewstar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byViewstar
STABILISATION OF OVERBURDEN DUMPS IN SINGRAULI
The slope was divided into fragments with berms in between. Gabion toe walls were placed at the toe of each slope fragment and mulching (to promote veViewstar
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basViewstar
SUBGRADE IMPROVEMENT OF PAVEMENT
The solution involves, reinforcing the soft subgrade in order to improve the load bearing capacity and subgrade property in terms of CBR, by using biaViewstar
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaViewstar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersViewstar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tViewstar
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiViewstar
TEMPORARY PROTECTION MEASURES FOR KIRATPUR-NERCHOWK PART OF NH-21
As per the site observations, multiple Rockfall barrier lines of nominal capacity 750kJ (RB 750 Plus) and 4 m height has been constructed for 300 m ovViewstar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Viewstar
TERRAMESH REINFORCED SOIL WALL TO APPROACH A RAILWAY OVER BRIDGE (
The Terramesh System was preferred due to the cost effectiveness when compared with alternative solutions. The construction of Terramesh in fact did nViewstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaViewstar
TERRAMESH SYSTEM AT NAGAR
Terramesh (back to back) with a gabion facia was adopted as a solution. Terramesh was selected over other types of reinforced soil wall systems due toViewstar
TERRAMESH WALL SYSTEM IN NANDGAON
Terramesh with gabion facia was adopted as a solution. It was the first of its kind for the client, Maharashtra State Road Development Corporation LimViewstar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bViewstar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengViewstar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionViewstar
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacViewstar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prViewstar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Viewstar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slViewstar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxViewstar
TSHO ROLPA GLACIER LAKE OUT BURST PROTECTION WORK
Lined canal (using Gabions and Reno Mattresses) and a gated structure was constructed for controlled discharge of water which helped lower the water lViewstar
VADODARA-MUMBAI EXPRESSWAY – TWO TIERED WALL
Out of the various alternatives, Reinforced Soil (RS) Wall system MacRes with precast concrete panels as fascia and BBA certified ParaWeb geostrip as Viewstar
VARIOUS STRUCTURES AT ANANDPUR SAHIB CANAL AT NH-21
Reinforced soil wall with concrete panels as facia and Paraweb as reinforcement was selected as the best solution. Three types of panels were used as Viewstar
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingViewstar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comViewstar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mViewstar
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaViewstar
Haven’t found what you were looking for?
Meet our Experts
We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.