Facebook pixel

Lower Campbell Repair

Home > Povesti de succes > Lower Campbell Repair

Channelling Works

2012

FLAGSTAFF - ARIZONA - U.S.A.

COCONINO COUNTY

TIFFANY CONSTRUCTION COMPANY

KIMLEY HORN & ASSOCIATES

Lower Campbell Repair

Problem

In 2001, the Schultz fire left the eastern slopes of the San Francisco Peaks barren and prone to flash flooding.

The Campbell Avenue ditch needed to withstand the larger water flows caused by the lack of vegetation during the monsoon season. Maccaferri’s gabions were chosen to provide erosion control protection on the channel’s banks.

The rock-filled gabion baskets could guarantee the protection needed for the hydraulic forces while providing a pleasing aesthetic.

Solution

The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base.

MaxTex® H 60.1 is a non-woven geotextile that was used in conjunction with the gabions to filter the fine soils from the backfill and prevent them from migrating to the gabions. 

Strict adherence to the installation guide was required to achieve the performance and aesthetics required of the project. Maccaferri provided installation training and job site visits. Technical assistance was also given during the design phase.

Used Products

Gabioane
Gabioane
A Wide Portfolio of Solutions Maccaferri offers an extensive range of tailored solutions to meet every specific needVizualizare
star

Contactează-ne experții chiar azi

Echipa noastră de experți este pregătită și dornică să te ajute: fie că ai întrebări despre cele mai recente produse ale noastre, fie că cauți soluții personalizate pentru provocările tale specifice, suntem la doar un clic sau un apel distanță.

Image
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.