Problem

Given the events following the El Niño phenomenon in 1998, the Nazca Valley has been affected by river overflow and ravines. The high vulnerability to overflowing on the right bank of the natural drain in the Cajuca area of the Nazca district poses a latent danger to the entire population of the populated centers Cajuca I, II, and Buena Fe.

Solution

The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determined as a solution is the dredging and channeling through a river defense structure with gabions and an anti-undermining base of 1,300 meters on the right bank of the natural drain of Cajuca. Maccaferri provided technical advice to the Cajuca consortium, responsible for the execution of the project, in order to ensure the optimal functionality of the project and the completion of the construction process.

Used Products

Reno Matrace Plus
Reno Matrace Plus
RenoMac PlusNa základe úspechu matraca Reno Mattress Plus poskytuje RenoMac Plus rovnaké výhody udržateľnosti a výkonu v Pohľad
star
Gabiony
Gabiony
Široké portfólio riešení  Spoločnosť Maccaferri ponúka širokú škálu riešení na mieru, ktoré spĺňajú všetky špecPohľad
star

Spojte sa s našimi odborníkmi ešte dnes

Náš tím odborníkov je pripravený a ochotný vám pomôcť: či už máte otázky týkajúce sa našich najnovších produktov alebo hľadáte prispôsobené riešenia pre svoje špecifické výzvy, sme len kliknutie alebo telefonát ďaleko.

Image
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.